THE SYSTEM
One of the biggest issues for a developer in offshore wind is having clarity on the traceability in respect of the construction of its windfarms. That’s where Smart Client comes in. We provide a fully traceable system, from manufacture right through to install, that can be used at all levels in the construction phase. Specialising in the cables package at present, but soon to expand to other packages, we provide a platform for Managers, Engineers, through to Inspectors with use of a cloud based system for project progress.
Fully traceable, all of the time. Smart Client works seamlessly from a desktop, or app based system. Each clients individual needs can be catered for within Smart Client, hand us the information and we shall build your system for you to use.

PROJECT PHASES
Phases of a project that Smart Client can assist

PROJECT MONITORING & TRACEABILITY
-
Aids in project planning and monitoring of schedules within the cable package
-
Specific manufacturing monitoring of:
-
Cable Core Manufacturing
-
Fibre Optic Manufacturing
-
3 Core Cable Manufacturing
-
Cable Protection system Manufacturing
-
Bellmouth Manufacturing
-
Specific Installation Monitoring of
-
Cable load out to vessel
-
In and out Surveys
-
Asset Mobilisation
-
PLGR
-
Cable lay and burial
-
Cable Pull-in - Termination and Testing
-
Final Commissioning
Smart Client links manufacturing to installation, for a fully traceable and easy to use cloud based system.

DESKTOP AND APP BASED
-
Can be used in office via desktop, or on site using app
-
Can be used on all smart phones and tablets
-
Fully customisable to clients requirements
-
Simple and easy to use, allows the streamlining of progress reporting
-
Works offline then syncs to update once internet access is available
-
Can incorporate checklist style system, capturing either photos, files, free text, or simple question answers at each stage

PROJECT PERFORMANCE
-
Monitoring progress and tracking live from inspectors in factory, or reps offshore
-
Helps identify issues against contractors reporting early to minimise impact
-
Able to be used as part of daily and weekly progress reporting

PROJECT CLOSURE
-
Assists when reviewing contractors final as-built documentation
-
Full details of what parts are where on your windfarm, allowing for quick identification of areas that may be effected, helping to minimise downtime
-
Can be used as a deliverable to O+M team for use after construction phase is complete